Sign In | Join Free | My chinaqualitycrafts.com
China Qingdao Jingcheng Weiye Environmental Protection Technology Co., Ltd logo
Qingdao Jingcheng Weiye Environmental Protection Technology Co., Ltd
Solution expert for organic waste treatment bio-resource utilization eco-energy environmental protection project
Verified Supplier

1 Years

Home > Steel Structure >

Q355B Prefabricated Steel Mezzanine Steel Structure Pre Engineered

Qingdao Jingcheng Weiye Environmental Protection Technology Co., Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment

Q355B Prefabricated Steel Mezzanine Steel Structure Pre Engineered

Brand Name : Senwang/OEM

Model Number : SW-085-1

Certification : ISO14001(2015)

Place of Origin : China(Mainland) Shandong Province

MOQ : 500sqm

Price : USD 50-100/SQM

Payment Terms : L/C, T/T, Western Union

Supply Ability : 100000 tons/year

Delivery Time : 30-60 workdays

Packaging Details : OT container nude, HC container with steel pallet

Wind speed : As clients' request

Material : Q355B, Q235B

Surface treatment : Painting/Galvanizing

Oversea installation : Available

Free design : Available

roof and wall panel color : seablue/white gray/customized

Contact Now

Prefabricated Metal Steel Frame Industrial Buildings Pre Engineered Mezzanine Steel Structure

Steel Structure Project Show

Q355B Prefabricated Steel Mezzanine Steel Structure Pre EngineeredQ355B Prefabricated Steel Mezzanine Steel Structure Pre EngineeredQ355B Prefabricated Steel Mezzanine Steel Structure Pre EngineeredQ355B Prefabricated Steel Mezzanine Steel Structure Pre Engineered

Steel Structure Description:

Steel structure building are fabricated with steel, beside the steel beams and columns, roof and wall cladding are normally made of steel also.

Of course ceilings and interior walls could also be made of gypsum and other materials. Steel Structure building also normally used as warehouse, workshop, hangars, animal shed. Now the usage of steel structure is become more and more popular, such as hosipital, shopping mall, residental building.

Steel Structure Connect:

Q355B Prefabricated Steel Mezzanine Steel Structure Pre Engineered

Steel Structure Andvantages:

Compared with other building materials such as wood, steel has the following advantages:

1.Steel is structurally sound , it's fabricated to strict specifications and tolerances.
2.Very environmentally friendly because all the materials are 100% recyclable
3.Steel does not warpage, bend, twist or bend easily, making it easy to modify and providing design flexibility.

4.It is also easy to install, which will reduce the intallation cost.

5.Quality of steel building is better, it reduces maintenance while providing greater safety and resistance.

6.With the spread of mold and mildew in residential construction, the use of steel minimizes these intrusions. Mold needs moist, porous material to grow. Steel studs can avoid these problems.

7.Steel structure construction is easy to construct and easy to move.

Material Q235B/Q355B
Length customized
Width customized
Height customized
Column Q235, Q345 welded H section steel
Beam Q235, Q345 welded H section steel
Purlin Q235 C channel or Z channel
Knee brace Q235 angle steel
Vertical and transversal support Q235 angle steel, round bar or steel pipe
Tie bar Q235 steel pipe
Brace Q235 round bar

Steel Structure Fabricate Process:

Q355B Prefabricated Steel Mezzanine Steel Structure Pre Engineered

Steel Raw Material Third Party ( SGS) Testing Report:Q355B Prefabricated Steel Mezzanine Steel Structure Pre EngineeredQ355B Prefabricated Steel Mezzanine Steel Structure Pre Engineered

Feedback Of Other Clients

Q355B Prefabricated Steel Mezzanine Steel Structure Pre Engineered

The four factors that affect the cost of steel structure plant:

Steel structure plant is destined to have a strong construction market share because of its beautiful appearance, short construction period, high degree of industrialization and reuse of resources. The steel structure plant cost is also a concern for many people, both to control the steel structure plant cost and can play steel structure plant technical advantages is the focus of many steel structure enterprises, which affects the steel structure plant cost factors are mainly four aspects: A. raw material factors.

A. Raw material factors.
Steel and plate is the main component framework of the steel plant, accounting for about 70%-80% of the total cost of the steel plant, the fluctuations in the market price of steel raw materials directly affect the cost of steel plant. The material and surface of steel sections, the thickness and material of the enclosing plates have a great difference in price. Steel structure raw materials are the main factors affecting the cost of steel structure plant.

B. Design factors.
Reasonable design is to save raw materials to control the cost of steel plant fundamental issues. Steel structure plant different design program is an important reason for the change in the value of raw materials, directly affect the total cost of steel structure plant.
1. foundation design: foundation cost and plant location geology has a close relationship, the foundation construction period accounts for about 25% of the total plant construction period, the foundation cost is 15% of the total cost of the steel plant. Design to pay attention to the geological report of the plant location, choose a reasonable foundation type, control the foundation of the load surface and buried depth of the total cost of steel plant plays a positive role.

2, steel beam design: rectangular section beam is the most common bending member, often used in the design, but the material utilization rate is very low. One is because the material stress near the neutral axis is low; the second is that the bending moment of the beam is variable along the beam length. Due to the low stress in most sections of equal-section beams, the material is not well utilized, and the material utilization rate can be improved only when the beam is stressed in the axis. Therefore, the design can use plane joist instead of rectangular beam. The plane joist is equivalent to hollowed-out beam, and the excess material in the beam is hollowed out, so that it is economical and the self-weight can be reduced. It can also be developed into a space grid, and the utilization rate of material can be greatly improved.

3, column network design: column network layout is to determine the span and spacing of the column, in the process requirements allow, try to choose a small span of the portal frame is more economical. In general, the optimal spacing of portal frame is 6m-9m, when there is a large tonnage crane, the economic column spacing is generally 7m-9m, should not exceed 9m, more than 9m, roof purlins, crane beam and wall frame system of steel will also be increased accordingly, the cost is not economic. Thus, the column network layout is reasonable for the steel structure plant cost has a great impact.

C. Construction and installation factors.
The length of the construction period is also a part of the cost of steel structure plant, the installation technology is skilled or not is the main reason for the length of time. The construction of structural plant is a system project, involving a wide range of factors affecting the construction cycle, policy changes, large volume of work, etc. can affect the cost of steel plant.

D exchange rate factors.
In the international trade exchange rate factor is also an important factor leading to price changes.

Translated with www.DeepL.com/Translator (free version)


Product Tags:

Q355B Prefabricated Steel Mezzanine

      

Q355B Mezzanine Steel Structure

      

prefab mezzanine structures

      
Quality Q355B Prefabricated Steel Mezzanine Steel Structure Pre Engineered for sale

Q355B Prefabricated Steel Mezzanine Steel Structure Pre Engineered Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Qingdao Jingcheng Weiye Environmental Protection Technology Co., Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)